Installation Manual Of Flatwork Ironer with Three Rollers


Because the size of Flatwork Ironer with 3 rollers are two big ,it needs to be  took  off this machine into two pcs that Part A and Part B 
1 Flatwork Ironers Part A and Part B are supposed to be connected by nuts and screw ,holes are left on the machine in advance ,and those screw and nuts are packed and put into flatwork Ironer s  electricity box 
 When client get this three roller flatwork ironer please fix Part A and Part B by those Nuts and Screw 
2 After Part A and Part B are installed ,please install steam pipes by pipes sent along with flatwork Ironer 

 The above photo shows steam pipe without installation 

The above photo shows steam pipes well completed 

After installed the ,flatwork Ironer Ironers driven system would like the follows

4 by now ,flatwork Ironer of three rollers has been assembled 

5 Instal steam to the steam port of flatwork Ironer ,and also instal one piece of steam valve (Manual )

6 Install electricity power LINES A B C N  to electricity box of flatwork  Till now the installation job of flatwork ironer has been finished